Erosion Control

Bio Mass Tech, Inc. has a background in erosion control dating back to 1994 when Hurricane Albert dumped over 17 inches of rain on central Georgia. The aftermath of the flood produced the need for EWP (emergency watershed protection) contracts to be let. The contracts involved rapid response deployment to rivers in order to remove obstructions from the rivers and armoring the bridge abutments to prevent any additional loss of bridges due to the flood waters.

Since 1994 Bio Mass Tech, Inc. has sent its employees to many training seminars and trade shows to learn about the newest regulations and products so that we can service our customers better.

We have implemented the best of today’s technologies and products and highly trained crews to provide a superior solution to our customers. Geoweb, Reno Mattresses, Gabions, Pumped Concrete Mat, Rip-Rap, Hydromulch Erosion Control Application, and High Strength Polymers are some of the products that we install on a regular basis.

 

Pond Compliance

CDD’s are required to maintain their ponds as they were permitted for construction. Shoreline erosion is required to be repaired. Bio Mass Tech, Inc. has completed hundreds of shoreline repairs using every type product on the market today along with prototype products. Our vast experience gives our company a unique advantage over other contractors; this allows Bio Mass Tech to warrantee our work.